| Home | /Yichang FTZ > News > |
On October 11, review of professional construction drawings of the Qiaobaren tourism factory project invested by Hubei Qiaobaren Leisure Food Co., Ltd. was completed in only 7 days. It was the first time that China(Hubei) Free Trade Zone Yichang Area had settled the whole business online through the digital platform of “multi-review integration”.
Compared with the traditional mode of off-line drawing review, the “multi-review integration”, based on "acceptance at one window, online circulation, digital delivery”, carries out online joint review of construction drawings and electronic vector diagrams of related documents, aiming at making data run more and enterprises run less errands to maximize the efficiency of drawing review.
“It saves the trouble of running errands and running errands several times with the drawings, and it saves time and effort.” Hu Chunli, general manager of the company, introduced that the investment enterprises needed to send the drawings to the review company and departments of fire control, planning, meteorology, civil air defense and other departments, and they also needed to submit to all these departments the revised construction drawings when review opinions were given. The process usually took about one month. Now, the enterprises just need to log on the “multi-review integration” platform to upload electronic drawings. When all departments have put forward their opinions for revision, these opinions go to the designer directly. The whole process takes only a week.