Yemingzhu Road will be closed for two months’ BRT construction
2016-12-29 11:49:32
Owing to the starting construction of hoisting box girder in the comprehensive reconstruction engineering project on urban Yemingzhu Road, for the smooth progression of this project and for the sake of traffic safety, from now on, traffic control will be implemented on the Yemingzhu Road (from Dongshan Avenue to Tiyuchang Road) for two months.
During the controlling time, Yemingzhu Road will be fully closed with temporary passages provided, on which motor vehicle parking is not permitted. Meanwhile, motor vehicles are prohibited entering into the Yemingzhu Road from Dongshan Avenue or Tiyuchang Road. So the original course of all vehicles from Tiyuchang Road to the in construction section of Yemingzhu Road are replaced by that from Tiyuchang Road to Dongshan Avenue through the temporary passages beside Tiyuchang Road, Changliu Road and Xiling Second Road. Reverse drive is also forbidden on all the road sections. In addition, the residents in or around Zhenjing Garden Housing Estate on the Yemingzhu Road can go in or out the housing estate by the temporary passage from Dongshan Road. (Reporter Wang Suzhi, correspondent Wu Jiangyun)