It is learned on May 24th that from May 28th 21:00to May 29th 6:00 the Yiling Yangtze River Bridge will beentirely closed (to be postponed in rainy weather)for maintenance, according to Yiling Yangtze River Bridge traffic control programissued by Yichang’sTraffic Police Detachment, three bus lines: No.B28, No. B82 and No. B27 passing through the bridge will be temporarily adjustedthen.
Bus No. B82 willpass through the bridge and run on the original route as usual before 21:00on May 28th, but after that time, when itreaches the Beishanpo Station(BRT station), it will turn around at theturntable and pass through Dongshan Avenue, Zhixi Yangtze River Bridge and Jiangnan Avenue, and then follow itsoriginal route to the Tanjia RiverStation.
As for Bus No. B27,from 20:50on May 28th, thosetrips starting fromthe 7th Traffic Bureau will pass through Jiangnan Avenue to WulongRoad, and turnaround at the approach bridge of Yiling Yangtze River Bridge, and then return to ZhixiYangtze River Bridge by way of theJiangnan Avenue; after it goes off the bridge at the north, it will go along Yanjiang Avenue, Xiling No. 1 road, Dongshan Avenue and reachBeishanpo and then turn round at theturntable and follow itsoriginal line to Yiling Square, and then reach the 7th Traffic Bureauthrough the ZhixiYangtze River Bridge, and finally end its trip at the Wulong Station. (Reporter:Yuan Xuemei;Correspondent:GengWenqing)