The reporter learnsfrom Yichang Citytraffic police detachment that traffic control will be carried out from 21:00 in May 28th to 06:00 in May 31th owing to themaintenance of the south section of theYiling Yangtze RiverBridge.
From 21:00 in May 28th to 06:00 in May 31th, the Yiling Yangtze River Bridge will befully closed for construction (postponed for rainyday). Duringthe period, the passage of motor vehicles is forbiddenon the Yiling Yangtze River Bridge, and the transportationmode of pedestrianandnon-motor vehicle remainunchanged.From 06:00 in May 29thto 06:00 in May 31th, the south section of the Yiling Yangtze River Bridgewill be half-closedforconstruction. During the period, the passage ofall freight vehiclesisforbiddenon the Yiling Yangtze River Bridge. Othervehicles from the north to the main bridge surface will be allowed in bothdirections. And it is necessary to use non-construction lanes when exiting or entering the south bridge. (Journalist Gong Changjun, Correspondent Zhu Huagang, Yao Yong)