Reporters learned from Wujiagang Traffic Police that at about 4 p.m. on the 15th, the main road of Yigu(Transliteration) Section in Wujiagang District is closed for construction. In order to avoid traffic congestion and ensure safe passage, traffic control will be implemented during construction.
Reportedly,the closure time is from May 15, 2019 to 2021for the closed area (from Yichang Gonglian Market to Longpan Lake). All the passing vehicles can pass via auxiliary lanes on both sides during the closure period.
Reminders from the traffic police: drivers are required to plan the route in advance, and slow down or take the expressway when passing construction section. Drivers are supposed to obey the command of the traffic police on the spot, avoiding rushing forward and paying attention to traffic safety.(Reporter Pei Shujing; Correspondent Liao Yaqian)