According to Yichangdong Railway Station, 42.5 pairs of temporary trains will be operated during the 40-day Spring Festival travel rush from January 26 to March 5, 2024, 15 days prior to the Spring Festival and 25 days following it.
It is said that 13 pairs of temporary through trains will be put into service, including 8 departure pairs and 4 through pairs. The Liangwu-Suining section of the train No. Z333/4 from Shenzhendong to Chengdudong will be shifted to the train No. Z4333/4 from the Nanjing to Chengdu. 29.5 pairs of temporary trains will be operated in Hubei Province, including 17.5 pairs between Hankou and Yichangdong, 1 pair between Wuhan and Yichangdong, 2 pairs between Yichangdong and Enshi, 6 pairs between Hankou and Enshi, and 3 pairs between Hankou and Lichuan.
In addition, a few lines will be modified or suspended. The operation section of one regular train will be changed, namely, the train D3158 shifted from Yichangdong-Nantong section to Hankou-Nantong section, and two regular pairs will be halted, including the K617/8 of Xiangyang-Zhanjiang section and the K1269/70 of Fuzhou-Chongqingbei section. (Reporter/Deng Yuqin, Correspondent/Yang Qinghui)