• Chinese
  • Home
  • News
  • Travel
  • Life
  • Culture
  • Foreign Affairs
  • Study
  • Yichang FTZ
  • FAQ
Home/City > News >
First 220 kV smart transmission line renovations completed
2024-11-25 09:45:00
  At 4:10 am on November 18th, the 220kV Gaoziyuan Substation in Yichang City successfully transmitted power via the Gaogan double-circuit line, marking the completion of the first intelligent protection upgrade and replacement project for a 220kV transmission line in Yichang.

  The Gaobazhou-Ganziyuan single-circuit line and Gaobazhou-Ganziyuan double-circuit line serve as crucial connections between the 220 kV Ganziyuan Substation and the Gaobazhou Hydropower Station, spanning a total length of 8.57 kilometers. The original line employed high-frequency protection, which utilized a protection channel relying on overhead power transmission lines, as made signal transmission susceptible to weather conditions and electromagnetic interference, thereby affecting its reliability. The intelligent protection renovation of these lines will significantly enhance their efficiency. (Reporter/Zhao Jingyi, Correspondent/Li Ziyan)