The site of bridge load test. (Reporter/Fu Beibei)
On the evening of October 22, upon the on-site command of Zhou Changdong, the Chief Technical Advisor for Bridge Engineering at the Yichang City Development and Investment Group, two trucks, each carrying a load of 35 tons, took the lead in initiating the static load testing on the bridge. (Reporters/Yang XueandGao Yu, Correspondent/Liu Xianting)