
After more than ten years’ tackle in a comprehensive way, Guan Zhuang has made remarkable achievements in the basin construction, which covers a conservation area of 13.3 square kilometers. The project also includes the transformation of the slope into terrace for about 1510 mu, the building of a forest for water and soil conservation for about 4240 mu, the planting of fruit-bearing trees for 11000mu and the construction of 360 small relevant water conservancy projects. With all these, the basin has been recognized by the country as National Soil and Water Conservation Ecological Environment Construction Demonstration Small Basin.(Reporter: Huang Xiang; Correspondent: Deng Zhongming; Photographer: Deng Zhongming )